Industrie

 

Luz Construct development by diversifying its activity

 

Beneficiary: Luz Construct

Funding Program: Regional Operational Program 2007-2013, Priority Axis 4 - Supporting the development of regional and local business environment, Key area of ​​intervention 4.3 - Support the development of microenterprises

Grant amount: 847,184.80 Lei

Project implementation period: 02/22/2013 - 21/02/2014

Project geographical location: West Region, Arad county, Calea Romanilor, no. 17-19, Arad

Brief project description:

Luz Construct project aimed to develop the company by diversifying the services offered. Through the project, besides construction contracting - its core activity, the company wanted to develop by providing body care services as well. The project consisted therefore in arranging and equipping with modern, latest generation equipment, the EDA Beauty Experience - remodeling, relaxation and body care salon. The main acquisitions in the project were represented by: endermologie equipment, electro stimulation equipment, hair removal machine, radio frequency machine, dermoporation machine, infrared electro stimulation machine, thermal bed, drainage device, detoxification machine, skin scanner, vibromassage apparatus, volcanic stones set, infrared capsule and shower for wraps, ambient and specific spa furniture.

More information can be obtained at www.edabeauty.ro


Purchasing new equipment to develop a production line for solvents, thinners and dissolvents purified from spent solvents

 

Beneficiary: Territory Commerce

Funding Program: Regional Operational Program 2007-2013, Priority Axis 4 - Supporting the development of regional and local business environment, Key area of ​​intervention 4.3 - Support the development of microenterprises

Grant amount: 430,370.00 Lei

Project implementation period: 24.09.2010 - 23.09.2011

Geographic location of Project: Western Region Timis County, Calea Stan Vidrighin, No.18

Brief project description:

The project aimed to develop the industrial solvent recovery activity of Territory Commerce through the acquisition of specific equipment, in order to develop a production line for solvents, thinners and dissolvents purified from spent solvents.

The main acquisitions in the project were represented by: central steam, effluent monitoring system, alarm and fire system, chemical dosing pump, centrifugal pumps and filters.

By its purpose, the project contributed to solving the problem of industrial waste management resulted from the West Region companies, which is collected by Territory Commerce SRL and turned into new products.


Increasing the competitiveness S.C. BKD ELECTRONIC S.A. Petrosani by purchasing an automated assembly line of electronic components

 

Beneficiary: SC BKD ELECTRONIC S.A.

Funding program: Increase of Economic Competitiveness Sectoral Operational Program 2007-2013, Priority Axis 1 - An innovative and eco-efficient production, Area of ​​intervention 1.1 - Productive investments and preparation for market competition of enterprises, especially SMEs, Operation a) - Support for strengthening the productive sector by tangible and intangible investments.

Grant amount: 919,990.00 Lei

Project geographical location: West Region, Petrosani City, Hunedoara County

Period: 2008 - 2010

Brief project description:

The overall project objective is to consolidate and develop SC BKD ELECTRONIC SA, manufacturing company that activates in a leading field, namely, electronics and electrical industry, on the principles of technical- economic performance and efficiency.

Specific objectives:

  • The development of production capacity of the company in order to increase turnover by at least 10% in the first 3 years after project implementation;
  • Increasing the number of company employees more than 20% due to this project;
  • Implementation in the SC BKD ELECTRONIC S.A. modern production technologies in accordance with IPC - A-610D February 2005 Revision. It states that IPC-A-610D Standard "Acceptability of Electronic Assemblies" is the best known and accepted document in the electronics assembly industry, further details on this standard may be obtained at the web address www.ipc.org.
  • Optimizing the use of human and material resources within the company to improve the performance indicators of the company, as a precondition for its sustainable development;
  • Increasing the quality SMD and THT assemblies in order to maintain SC BKD ELECTRONIC S.A. among the top 5 companies in the field in Romania;
  • Adding new technological processes in the production workflow enabling the diversification of conditions for exploiting of products made by the company;
  • Starting procedures for the implementation of environmental management system in accordance with ISO 14001.

The objectives presented above reveal that the project aims at expanding and upgrading SC BKD ELECTRONIC S.A. and provides including changes in the existing production process within the company.

All this will contribute to:

  • developing the productive sector of electronic and electrotechnic fields based on expansion and modernization, through buying new equipment and technologies, licenses and know-how;
  • innovation of production processes and products;
  • adopting European and international standards and management systems certification (quality, environment, etc);
  • maintaining existing markets and access to new markets;
  • promoting sustainable development, reducing negative environmental impacts and improving international competitiveness.

In the framework of this project were purchased five equipments, as follows:

  1. Automatic Printer - Print solder on PCB, automatically inspects the print quality with a camera, cleans screen printing impurities after every print, increasing print quality and print speed
  2. Pick and Place automatic systems - device that positions the components on the motherboard
  3. Solder oven with 9 areas and nitrogen - which provides for the assembly device the realization of a SMD soldering profile as indicated by the solder alloy manufacturer, real-time visualization solder profile, providing decrease the time needed set -up site for bonding process
  4. Wave soldering machine, lead free compatible - improves the quality of THT solder assembly process operation, eliminating human errors, or the situation in which a man actually forgets to execute the solder and also reduce solder alloy losses by optimum arrangement of the alloy terminal components
  5. Automatic lacquering line of PCBs - enables the electronic modules to be used in severe operating conditions in terms of working environment

PCB means a printed circuit board on which are fixed electrical and electronic components. Equipment and machinery purchased through the project are part of intelligent systems, assisted by an internal microcomputer that can be programmed with their own software.


ESCAPADE FASHION SRL business development by implementing electronic commerce system

 

Beneficiary: ESCAPADE FASHION SRL

Funding Program: Increase of Economic Competitiveness Sectoral Operational Program 2007-2013, Priority Axis 3 - Information and Communications Technology for public and private sectors, Major Field of Intervention 3.3 - Support of e-economy, Operation 3.3.2 - Support for the development of e-commerce systems and other online business solutions

Grant amount: 925,015.00 Lei

Project Implementation Period: 23.12.2013-23.12.2014

Geographic location of Project: Western Region, Timisoara city, Calea Buziasului, no. 11 A, Timis

Brief project description:

The project consisted in the acquisition of modern ICT equipment and implementing an ecommerce system, capable to sustain long-term development of the company's assets.

The main acquisitions in the project were represented by: system for ecommerce, laptops, desktop + monitor systems, operating system licenses, antivirus and generic suite, uninterruptible power, printer, multifunctionals, switche 24P with management, access point.

By implementing the project within ESCAPADE FASHION SRL company all processes were organized and integrated based on the implemented IT system. The main benefits of the project implementation are:

  • an efficient and coherent operational activity, all processes being linked and easily interpretable;
  • business process automation;
  • much faster, direct and secure customer access to information outside the company;
  • providing additional data which the company didn’t have before project implementation: stock durability, the number of daily executed orders, customer deliveries situation etc. This data, once supplied to departments, translate into a better control of project, budgets and human resources.

More information can be obtained at www.escapadefashion.ro


Increased economic efficiency of DICLASSE SRL by implementing an efficient integrated IT system

 

Beneficiary: DICLASSE SRL

Funding Program: Increase of Economic Competitiveness Sectoral Operational Program 2007-2013, Priority Axis 3 - Information and Communications Technology for public and private sectors, Major Field of Intervention 3.3 - Support of e-economy, Operation 3.3.1 - Support for integrated ICT systems and other electronic applications for businesses

Grant amount: 785,400.00 Lei

Project Implementation Period: 09.09.2013-08.09.2014

Project geographical location: West Region, Timisoara, Calea Buziasului, no. 11A, Timis

Brief project description:

The project aimed at increasing productivity and economic efficiency of the company DICLASSE SRL and obtaining operational and financial excellence through the creation within the company of an efficient ICT infrastructure, capable to reorganize and effectively manage all internal processes.

The main acquisitions in the project were represented by: ERP integrated informatic system, CRM and BI, desktop + monitor systems, laptop, operating system licenses, antivirus and suite generic, uninterruptible power, mobile barcode scanners, database management system.

Project implementation in the DICLASSE SRL allowed:

  • efficientization of the work processes performed within the organization by:
    • transition from manual recording to informatic management of all the information from the operational activity of the company;
    • reducing the time required to achieve various activities (eg honoring commands from clients) through a better organization of internal processes;
    • reducing the time for information access and the response time to a request from the client;
    • significant reduction of the human errors that occur during the execution of the various activities;
  • a more efficient customer-organization chain through integrated informatic management of all the information related to this;
  • improving accounting controls and management decisions by implementing analysis and decision support tools (BI), as well as the possibility to obtain reports in the form and type of information required by them.

More information can be obtained at www.diclasse.ro